PETpla.net Insider 09 / 2020

MAINTENANCE PETplanet Insider Vol. 21 No. 09/20 www.petpla.net 28 Cold Jet introduces a simple way to improve production processes PET moulding is like car racing – speed and control are king The PET moulders constantly need to improve their OEE availability, quality and perfor- mance scores, all while lowering costs, extending the life of their tooling and improving their workers’ environment and safety. What if PET processors could produce 6.5 million preforms more per year? Cold Jet presents a simple way to improve production results by 3-5% with the introduction of the PCS 60 dry ice cleaning system. For an injection or a blow moulder, moulds are a mission critical asset and require timely, proper, fast and efficient cleaning to ensure uptime and part quality. When the moulds are not cleaned properly and on regu- lar basis it may cause blemish and unwanted flash on the final product, filling problems which lead to quality problems and longer production cycle time. In addition, solvents and other waste-generating cleaning processes are bad for the environment and are not acceptable for the health of the PET bottlers. Cold Jet’s dry ice clean- ing technology provides a solution that saves time and improves processes. Resulting in 3-5% increase of pro- ductivity and investment returned in a couple of months. With Cold Jet’s dry ice blasting equipment, PET moulders avoid the usage of chemicals. “The PET industry has never had one smart machine with the ability to adapt the cleaning process to so many different applications in plastics and rubber moulding,” said Steffen Kalisch, Key Account Manager, PET Industry, Cold Jet Europe. “This is the reason why Cold Jet has released the PCS 60 machine.” The PCS 60 features Cold Jet’s patented Particle Control System (PCS). This allows moulders of PET to have a higher degree of versatility in all of their cleaning applications. With the PCS, a PET processor can use one machine to clean many types of surfaces, such Mould Cleaning 48 Cavity IMM 96 Cavity IMM 144 Cavity IMM Production maximum (hours/year) 8,400 8,400 8,400 Time saving per week with Cold Jet 1.5 2.0 2.5 Time saving with Cold Jet per year 78 104 130 Efficiency improvement with Cold Jet 0.9% 1.2% 1.5% Extra hours production 78 104 130 Mould cycles per hour 360 360 360 Extra preforms made per year 1,347,840 3,594,240 6,739,200 Profit per preform 0.003 0.003 0.003 Profit per year from extra production 4,044 € 10,783 € 20,218 € Payback-time per IMM in months 89 33 18 Payback-time per 5 IMM in months 18 7 4 Return on investment (ROI) in Cold Jet dry ice cleaning equipment. Example cal- culated based on: maximum production, pre-set mould cycle time, estimated profit per preform, etc. Not taken in consideration: savings by labor cost, reduced repair costs, extended equipment life time.

RkJQdWJsaXNoZXIy NTY0MjI=