STADLER/BZB partnership: delivery of new-generation sorting plant
STADLER Anlagenbau GmbH, the globally active German company specialising in the planning, production, and assembly of turnkey sorting plants, has completed the comprehensive modernisation of the BZB (Bizkaiko Zabor Berziklategia) light packaging sorting plant in Amorebieta-Extano, Bizkaia, Spain. The upgraded facility was officially inaugurated on January 27, 2026, with representatives from BZB, Ecoembes, STADLER and regional stakeholders in attendance. The modernisation is claimed to represent a major leap forward in capacity, automation, and digitalisation, enabling BZB to increase throughput, improve material purity, and future-proof operations in line with evolving regulatory and market demands.
BZB, a public-private partnership involving Garbiker and Trienekens País Vasco, has been a pioneer in sustainable waste management and recycling in the region. Specialising in the collection, sorting and processing of packaging waste, BZB transforms household and commercial materials into valuable recyclables and plays a vital role in promoting circular economy initiatives across Bizkaia.
The original BZB plant, commissioned in 2002, was STADLER’s first turnkey sorting facility in Spain and laid the foundation for its long-term presence in the country. The decision to modernise the plant rather than relocate it reflects BZB’s commitment to maximising the use of existing infrastructure while adopting advanced sorting technologies. Working within the constraints of the original building required precise planning and compact design solutions, but ultimately resulted in a highly efficient and modern installation that far exceeds its predecessor’s performance, says the company.
The definition of the sorting criteria was carried out in close coordination with Ecoembes, which, as a system partner, plays a key role in the planning and implementation of the facility.
A step change in performance and automation
The new BZB plant increases processing capacity from 3 to 8 t/h, more than doubling throughput while delivering higher recovery rates and cleaner output fractions. Designed to handle a wide range of light packaging waste, the facility produces high-quality fractions, including PET, HDPE, PP, PS, two film qualities, and ferrous and non-ferrous materials.
Incoming material is fed into the system through an automatic feeder and a pre-shredding stage that opens bags and loosens the waste stream. A trommel then separates the material into three size fractions, each processed independently using a combination of STADLER ballistic separators, magnetic and inductive separators, and high-performance NIR optical sorters. The sorted materials are conveyed to dedicated bunkers and baled for shipment.
The plant features reversible conveyors for flexible material routing and integrates bunker level sensors and automatic container change signaling to optimise day-to-day operations. All processes are fully supervised by a central monitoring system, ensuring high transparency and operational control.
A key differentiator of the new installation is its high level of automation. Compared to the original 2002 plant, the modernised facility uses space far more efficiently and reduces manual intervention. The improvements contribute to lower operating costs and increased overall efficiency, while also improving working conditions for operators.
Digitalisation and sustainability at the core of the upgrade
One of the most innovative aspects of the project is the integration of STADLERconnect, STADLER’s digital platform for plant monitoring and maintenance. The BZB facility is the company’s first plant in Spain to benefit from STADLERconnect Predictive Maintenance, enabling continuous supervision of equipment condition and supporting proactive maintenance strategies to maximise uptime.
Beyond performance gains, the modernisation is intended to strongly support sustainability and circular economy objectives. By increasing sorting accuracy and recovery rates, the plant reduces the amount of waste sent to landfill or final disposal, while enabling more materials to re-enter the value chain as secondary raw resources. Improved energy efficiency per ton processed further enhances environmental performance.
According to STADLER, the project was completed in a remarkably short timeframe, with assembly taking just three and a half months. Commissioning was completed at the end of October, two months earlier than originally scheduled.
Photo: Sorting plant inauguration at BZB. F.l.t.r.: Willi Stadler, CEO STADLER, Ana Lopez, Project Engineer at STADLER and Carlos Manchado, International Sales Director at STADLER

